CMM JUSTIFICATION WORKSHEET
This worksheet is provided as a guide only. No responsibility for accuracy is implied or will be accepted. No information is; or can be; retained by using this worksheet.
If you prefer to use an Excel spreadsheet please click
email
to request a copy.
Please enter your
Monthly
Hours, Costs, Parts, Values, in the corresponding boxes.
Use your right mouse button and click refresh to start-over. Browser back button to exit. Browser print to copy.
REDUCED INSPECTION TIME
X
X
=
X
.25
0
Hours to Inspect
an average part
£.00 Internal Labour
Rate per Hour
Parts per
Month
£ Cost to
Inspect Parts
Est. 25% Increased
Efficiency per Month
£ Labour Savings with
CMM Per Month
X
X
=
0
X
1
0
Hours to Generate
Inspection Report
£.00 Internal Labour
Rate per Hour
Parts per
Month
£ Cost to Generate
Reports
100% Efficiency -
Reports are Automated
£ Labour Savings with
CMM Per Month
REDUCED PRODUCTION MACHINE DOWNTIME
X
X
=
0
X
.25
0
Machines Hours downtime
waiting part inspection
£.00 Internal Labour
Rate per Hour
Parts per
Month
£ Cost of Idle Labour
per Month
25% Est. Reduction
in Idle Labour
per Month
£ Labour Savings with
CMM Per Month
X
.25
0
Monthly Cost of Lost Production (due to machine downtime)
25% Est. Reduction
in Lost Production
Costs per Months
£ Labour Savings with
CMM Per Month
REDUCED SCRAP & REWORK
X
.05
0
Monthly cost of scrap (Improved inspection reduces costs)
5% Est. Reduction
in Scrap rate
£ Savings by Reducing
Scrap with CMM
X
.20
0
Monthly cost of Rework (improved inspection reduces Rework)
20% Est. Reduction
in Rework rate
£ Savings by Reducing
Rework with CMM
£ Total Savings Per Month
0
Payback in Months =
Cost of CMM
Total Savings per month
0
0
Cost of CMM
T
otal Savings Per Month
Months to payback